We take a pioneering method to contaminated plus potentially tainted land projects for Preliminary Site Investigation. Our team has productively formulated client-focused strategies for housing development sites, large scale infrastructure projects along with complex commercial or else industrial sites with versatile contamination issues, managing the procedure from pre-development phase through to delivery phase.
Detailed Site Investigation NSW |
As environmental legislation and authoritarian framework has evolved to more strict standards, greater significance has been placed on making sure the preparation and subsequent functioning of environmental planning documentation has been carried out. Our team can assist in the preparation of this Detailed Site Investigation NSW to facilitate the commencement of your project, despite of the size and complexity. This includes:
·
Construction
Environmental Management Plans
·
Acid Sulfate
Soil Management Plans
·
Waste
Management Plans
·
Pre-Demolition
Hazardous Building Materials Surveys
·
Review of
Environmental Factors
·
Asbestos
Management Plans
· Sediment & Erosion Control Plans
A Preliminary Site Investigation NSW is the primary step in assessing the stain status of a site proposed for redevelopment. This desktop revise, which believes pertinent public and site-specific data to arrange the initial assessment report to decide land-use suitability, usually takes between two and three weeks to organize.
We pride ourselves in the precision and rotate time of our Phase 1 Preliminary Site Investigations. Our knowledge and relationships with local councils plus government bodies combined with our technical knowledge permits us to convey the similar report, at the highest quality, in about half the time.
Detailed Site Investigation NSW includes invasive sampling to more precisely characterise a site in order to conclude the
nature as well as extent of contamination (if present). We offer a targeted
approach for our clients in undertaking this assessment to produce useful and
practical conclusions and recommendations with consideration to environmental
and property managements issues pertinent to the given project.